Work / Odoo & ERP · Advertising production · Saudi Arabia · 2026

One confirmed quotation now creates the factory's work orders and every installation job.

An advertising production house in Saudi Arabia builds signage and branded items in its own factory and installs them at customer sites, often one order across many branches. We built the flow that ties each quotation to what the factory must produce, where each unit goes and on which date.

30requirements in the agreed specification
7roles, each with its own manual in Arabic
2 daysdefault buffer between production and first install
14automated tests on the flow
A factory work order: its production deadline, and the sites and dates it has to serve
A factory work order: its production deadline, and the sites and dates it has to serve
Before

The same details, typed three times.

The stages existed, but the links between them were made by hand. The same details went into the quotation, then into the work order, then into an email to the production manager. Installation dates were followed up by phone and from memory.

One quotation line can be installed many times in many places. After the customer approved, nothing tied together what the factory had to produce, how many units went to each site, and whether production would finish before the first installation.

What we built

Confirm once. The rest is created from it.

We wrote the specification with the client in September 2026 and built to it. A request for quote is logged as an opportunity. The factory's estimator prices each item, and the account manager builds the quotation from those costs with a margin.

Every line that needs installing carries a plan: site, quantity and date. The quantities must add up to the line, or the order cannot be confirmed. Confirming creates one work order for each produced line and one installation job for each site. A job stays blocked until its work order is done.

  • Costing requestsSales asks the factory for a cost and a lead time per item, and each revision is kept.
  • Installation planEach order line is split by site, quantity and date, and checked before confirmation.
  • Production deadlineEach work order is due a set number of days before the earliest installation it serves.
  • At-risk flagsA work order expected to finish late is flagged, with the installation jobs that wait on it.
  • Crews and vehiclesThe coordinator gives each job a crew, a vehicle and a time, on a calendar or a map.
  • Sign-off on siteTechnicians record photos, the quantity installed and the customer's signature from a phone.
  • Partial installationsWhat could not be installed stays open as a follow-up job for the same site.
  • Seven role manualsAn Arabic manual for each role, from account manager to accountant, with its own screens.